| |
|
| Year of birth |  | 1960 |
Permanent/Home Location/Address |
| City or Town |  | Dhaka |
| State |  | Dhaka |
| Country |  | SRI LANKA |
Current Location/Address |
| State |  | Colombo |
| Country |  | SRI LANKA |
Languages |
| Primary Language |  | Fluency |
| English |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | BANGLADESH |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Bridge Designers |  | 15 |
| Building Control |  | 3 |
| Civil Engineer |  | 5 |
| Civil/Structural Designer |  | 10 |
| QA/QC Engineer |  | 3 |
| Industry |  | Years Experience |
| Building and Construction |  | 3 |
| Civil Engineering |  | 5 |
| Roads and Bridges |  | 15 |
| Consulting Engineer |  | 18 |
| Railways |  | 1 |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | Civil Engineering | Bangladesh University of Engineering and Technology, Dhaka, Bangladesh | 1986 |
Other Qualifications, Memberships, Certification
Member, Institution of Engineers, Bangladesh
Professional Engineer, Bangladesh Professional Engineer’s Registration Board.
|
Computer Skills and Software Used |
- AutoCAD
- Sap 90
- STAAD Pro
- MS Word
- MS Excel
- Math Cad |
Work Locations |
| Are you willing to move or relocate? | Countries NOT Willing To Work In! |
Yes - I will travel domestically
Yes - I will relocate domestically
Yes - I will travel internationally
Yes - I will relocate internationally | IRAQ
|
Availability |
| Start Immediately? |  | Available Now |
| Earliest Start Date |  | Given 4 weeks notice |
Ideal Next Job |
| Looking for work in a project design engineer, structural design engineer, structural engineer, bridge engineer, Project Manager for Bridge Construction in the Middle East on a family ststus basis |
Required Salary & Conditions |
| Minimum salary USD 8,000 per month plus paid housing and travel" |
Employment History |
| Total Years of Work Experience: |  | 24 |
| Commenced Full Time Work: |  | 1986 |
| Name |  | United Nations Office for Project Services (UNOPS) |
| Job Title: |  | Project Manager |
| Duration |  | From : 2006 To: 2007 |
Summary |
| Developed professional skill particularly for Designing Highway Bridges, (These Include RCC Bridges, Prestressed Concrete ‘I’ Girder Bridges, Prestressed Box -Girder Bridge, RCC Box Culverts) High rise buildings, strengthening of existing building against seismic effects etc. also leads a Quality Control Engineering team of mid/junior level Materials Engineers, Lab Technician, a design team of mid/junior level Engineers and Co-ordinate the activities of CAD operators in preparing drawings etc. |
Work Experience |
* With United Nations Office for Project Services (UNOPS), Sri Lanka:
- Project Manager on the Construction Supervision of Permanent Steel Bridge Construction Project under Tsunami affected areas rebuilding project at Sri Lanka. Project Management, of the Construction Works of two 300 m, one 150 m and one 250 m permanent steel bridge on RCC substructure with cast in-situ pile foundation, 5 km of approach road at Batticaloa and Trinkomalee, Sri Lanka.
Project Management, Lead the Construction Supervision team, Review and approve the construction method statement, Technical and Management support to RDA. Liaison with UNOPS Colombo Office, RDA, Local authority etc to solved the construction and local issue. Review and approved the documentation of contractors final bill, handing and taking over the individual contract of the project etc.
* With Dar al Handasah, Abu Dhabi, UAE:
- Al-Gurm Resort and Residential Development, Abu Dhabi, UAE, Sr. Structural Engineer on the following:
• Review and approve the shop drawings of Villas, Elevated road (Bridge).
• Review and approve the method statement construction of per cast Prestressed beam, pre cast slab for bridge deck. Prestressing system, transportation of pre cast beam and pre cast slab from factory to construction site.
• Construction supervision (top supervision) of Villas and Elevated road construction works
*Project Management, Quality Control of the Construction Works of 2 Nos. 300m, 1 No. 150m and 1 No. 250m permanent steel bridge on RCC substructure with cast insitu pile foundation, 05 Km of approach road and 01 Km long reinforced earth retaining wall at Batticaloa and Trinkomalee, Sri Lanka.
* Detail Design of 2 Nos. 300m, 1 No. 150m and 1 No. 250m permanent steel bridge on RCC substructure with cast insitu pile foundation and of 1 Km long Earth retaining wall at Yan Yoa bridge site at Trincomalee.
*Preparation of Specification, tender documents, Pre qualification documents. Evaluation of Prequalification documents to selection of Prequalify Contractors, evaluation of tender documents and final selection of Contractors for Construction works.
* Ensure the Quality of 35 MPa Concrete by field as well as laboratory test for foundation and substructure, Verticality of 3m dia of steel casing of pile, pouring of pile concrete. Pilot pile load test etc.
* Detail design 260m long (The longest bridge of Azerbaijan) PC I girder bridge and others 05 Nos. small bridge.
* Detail design of 6500m long flyover (PC box and I girder super structure over RCC substructure with pile foundation) at Muchak - Mogbazar.
* Detail design of 550m long (partly Prestressed Concrete ‘I’ girder and partly RCC deck girder bridge) flyover (rail over pass) including 2.5 Km long earth retaining wall to retain the earth of earthen hill beside the approach road of this proposed rail over bridge. 01 No. Prestressed Concrete ‘I’ girder bridge and 4 Nos. box culverts.
* Detail design of 750m long (100m span) Prestressed Concrete box girder bridge with well foundation.
* Detail structural design with safety against earthquake and construction supervision of 12 Storied training academy cum office building. The job was to confirm the building structures as per requirements of local and British Standards; up to desired safety level was prepared to the satisfaction of the client.
* The building hired by DIFID for use as their office was checked for adequacy of design and safety against erthquake. The job was to evaluate the existing building structures as per requirements of local and British Standards. Subsequently,
detailed design of the retrofit schemes to bring the structure up to desired safety level was prepared to the satisfaction of the client and construction supervision/QC of this structure.
* Design Of 200m x 50m Jetty, Design of Office, Cold Storage and Processing Plant at Mozambique.
* Foundation & Structural Design of 200m steel Railway Bridge over Sangu River, 320m & 240m steel Railway Bridge over Matamuhari River & 150m steel Railway Bridge over Bakkhali River.
* Design Of 35m Prestressed Concrete Bridge at Mopipi - Rakops road at Botswana.
* Foundation & Structural design, construction supervision and quality control of 450m Prestressed Concrete bridges over Arialkhan river) at Mawa-Bhanga road.
* Foundation & Structural Design of 04 nos. 20m PC Girder Bridges at ch.15+089, ch.16+016, ch.18+154, ch.19+039 respectively and 25 nos. single/double vent box culvert on Dhaka - Mawa road.
* Foundation & structural design of 450m PC Bridges (over Arialkhan River) at Mawa-Bhanga road.
* Foundation & Structural Design of 01 no. 30m and 01 no. 75m PC Girder Bridges at ch.5+158, and ch.7+732, respectively & 09 nos. Single/Double vent Box Culvert at Mawa-Bhanga road.
* Foundation & Structural Design of 120m PC Girder Bridges over Kumar River at ch.4+100,04 nos. 60m, 02 nos. 40m, 01 no. 30m, 01 no. 35m and 01 no. 120m PC Girder Bridges at ch.5+525, ch.6+566, ch.8+204, ch.14+225, ch.11+796, ch.13+095, ch.12+020, ch. 19+535, and ch.16+439 respectively and 14 nos. Single/Double vent Box Culvert on Bhanga-Bhatiapara Road.
* Foundation & Structural Design of 3 nos. 25m, 01 no 20m and 01 no 35m PC Girder Bridges at ch.2+130, ch.10+700, ch. 18+015, ch.33+330 and ch.34+912 respectively and 21 nos. Single/Double vent Box Culvert on Bhatiapara - Mollahat Road.
* Foundation & Structural Design of 5 nos. 30m, 01 no 25m, and 11 no 10m PC Girder Bridges at ch.5+562, ch.10+131, ch.15+052, ch. 16+667, ch.20+269, ch.7+199, ch.8+346, ch.10+930, ch.12+882, ch.13+854, ch.14+367, ch.15+976, ch.17+194, ch.18+008, ch.20+966, and ch.21+046 respectively and 18 nos. Single/Double vent Box Culvert on Mollahat – Noapara road.
* Foundation & Structural Design of 2 nos. 40m PC Girder Bridge at ch.27+470, ch.27+820 respectively and 19 nos. Single/Double vent Box Culvert on Feni-Chittagong Road.
* Responsible for site selection & preliminary design of 6.8 Km long box girder Prestressed Bridge including foundation design by computer program, Images.
* Involved in the preliminary design of 670m long Prestressed Box Girder Bridge.
and Preliminary design of 2 Nos 200m each approach via duct of Bhairab Bridge.
* Hydraulic design, stability analysis, structural & foundation design, cost estimation and construction supervision of following hydraulic structures.
- 22 vent Hamkura regulator over Hamkura River at polder 25.
- 01 No 5 vent, 01 No 4 vent & 03 Nos 2 vent drainage sluice.
- 12 vent & 15 vent drainage regulator for polder 59/3b & 59/3c respectively.
- 02 Nos 3 vent & 01 No 4 vent drainage sluice for polder 59/3b & 72 respectively.
* Responsible for supervision & quality control of the construction work of Dhaka New Super Market.
Training
Design, Construction and Maintenance of Highway Bridges, Organised by IEB, Dhaka 1996.
Design and Installation of piles, Organised by IEB, Dhaka 2000.
Seismic Resistant Design and Retrofitting of building Organised by Engineering Staff College, India, April 2002.
Training on Seismic Provision of BNBC (Bangladesh National Building Code)/93 Organised by Engineering Staff College, Bangladesh, Dhaka 2002.
Seismic Resistant Design and Retrofitting of Concrete Structures. Organised by Engineering Staff College India, May 2003.
Evaluation of Concrete Structures, Organised by Directorate of Continuing Education, Bangladesh University of Engineering & Technology, Dhaka 2006.
|
Comments/ Hobbies/ Interests etc: |
Reading
FDC |
Last Updated on 15-Apr-10
|